Presales Engineering
Site Surveys
Structured site capture that drives technical feasibility, hydraulic sizing, structural design, logistics packaging and installation method statements.
Surveys this year
3
Reports issued
1
Access-restricted sites
1
Planned visits
1
Survey register
| Survey | Site | Lead | Surveyor | Date | Area | Crane access | Status |
|---|---|---|---|---|---|---|---|
| SS-3301 | AquaWorld Dubai, Jebel Ali | LD-2401 | M. Iqbal | 2026-06-18 | 8,400 m² | Full | Report Issued |
| SS-3302 | Palm Lagoon, Male Atoll | LD-2404 | K. Ravi | 2026-08-02 | 2,100 m² | Restricted | Completed |
| SS-3303 | Splash Valley, Nairobi | LD-2403 | A. Fernandes | 2026-08-21 | 1,450 m² | Full | Planned |
Survey detail
Technical findings that constrain design and installation
AquaWorld Dubai, Jebel Ali
- Water source
- Desalinated municipal + 1,200 m³ balance tank
- Power
- 630 kVA available
- Elevation
- +3.2 m datum
- Constraints
- Night-time lifting only; 42 °C ambient design temperature.
Palm Lagoon, Male Atoll
- Water source
- RO plant, limited buffer
- Power
- 180 kVA (generator backed)
- Elevation
- +1.1 m datum
- Constraints
- Barge-only delivery; max package 6.0 m; salt-spray coating spec.
Splash Valley, Nairobi
- Water source
- Borehole + storage
- Power
- 250 kVA
- Elevation
- +1,795 m ASL
- Constraints
- Rainy-season programme risk; import clearance via Mombasa.
Standard survey checklist
Mandatory capture before concept design release
- Site address & GPS coordinates
- Available area and plot dimensions
- Elevation and terrain profile
- Existing buildings and structures
- Water source, storage and balance tank
- Pump room location and drainage
- Electrical supply and power capacity
- Access road and transport restrictions
- Crane accessibility and lifting windows
- Existing water park equipment
- Safety constraints and local regulations
- Climate and environmental design data
Photos, videos, measurements and drawings attach to each line and are compiled into the Site Survey Report.