Production orders released from the BOM, work centre capacity, FRP layup batch logs and steel fabrication job cards.

Open production orders

7

FRP batches logged

4

Resin, gelcoat and cure records

Steel job cards

4

Work centres

7

Capacity vs load

Production orders

IdProject IdItemWork CentreQtyCompletedStatusPlanned StartPlanned FinishDrawing ReleasedBom Approved
PO-FRP-3301PRJ-7001Funnel shell segmentFRP128In Progress2026-07-012026-09-05YesYes
PO-STL-3302PRJ-7001Tower columns & bracingSteel Fabrication6041In Progress2026-06-202026-09-12YesYes
PO-FRP-3303PRJ-7002Raft flume sectionsFRP280Planned2026-09-102026-11-15NoYes
PO-ASM-3304PRJ-7005Wave pool caisson assemblyAssembly44Completed2026-04-022026-06-18YesYes
PO-ELE-3305PRJ-7005MCC panel wiring & FATElectrical11Completed2026-05-112026-06-30YesYes
PO-PKG-3306PRJ-7006Body slide packing cratesPacking1411In Progress2026-08-052026-08-27YesYes
PO-FRP-3307PRJ-7003Kids play FRP componentsFRP220Hold2026-09-012026-10-20NoNo

Work centre loading

NameCapacity HrsLoad HrsQueuedIn ProgressCompleted M T DRejection %
FRP3200364064223.1
Steel Fabrication2800241043312.2
Machining90062021181.1
Assembly1600148032121.6
Painting80054011152.9
Electrical7006902270.8
Packing60041021260.4

FRP layup & cure batch log

IdProduction Order IdMould IdOperatorLayersThickness MmResin Std KgResin Actual KgGlass KgGelcoat KgCure HrsStatus
FRP-B-9012PO-FRP-3301MLD-114Sunil K.78.43103361882614Demoulded
FRP-B-9013PO-FRP-3301MLD-114Imran S.78.13103221842515Finishing
FRP-B-9014PO-FRP-3301MLD-114Sunil K.78.63103481912813Curing
FRP-B-9015PO-FRP-3307MLD-121Ganesh P.56.21801831041712Inspected

Steel fabrication job cards

IdProduction Order IdOperationWelderGradeHeat NoDft MicronWeld Inspection
SJ-4401PO-STL-3302WeldingW-114 R. YadavIS2062 E250HT-882310Passed
SJ-4402PO-STL-3302WeldingW-121 M. DasIS2062 E250HT-882310Rework
SJ-4403PO-STL-3302PaintingIS2062 E250HT-88117185Passed
SJ-4404PO-STL-3302CuttingSS304HT-900420Pending