VS

Engineering

Engineering & Drawing Revision Control

Concept, structural, hydraulic, electrical and fabrication drawings under revision control with a customer approval gate before production release.

Drawings under control

7

2 released for production

Awaiting customer approval

2

SLA 3 working days

Revision required

1

Engineering changes open

2

ECR / ECN / ECO

Approval workflow

Each drawing progresses through this gate sequence

  1. Draft
  2. Engineering Review
  3. Internal Approved
  4. Customer Review
  5. Customer Approved
  6. Released For Production

Drawing register

DrawingTitleProjectDisciplineRevEngineerUpdatedPendingStatus
DWG-6101Tornado slide — general arrangementPRJ-7001General ArrangementRev CN. Pillai2026-05-210 dReleased For Production
DWG-6102Tower steel structure — fabricationPRJ-7001FabricationRev BH. Gokhale2026-06-020 dReleased For Production
DWG-6103Pump room hydraulic schematicPRJ-7001HydraulicRev BT. Bhatt2026-08-117 dCustomer Review
DWG-6104Family raft slide — GA & elevationPRJ-7003General ArrangementRev AP. Nayak2026-08-135 dCustomer Review
DWG-6105Foundation loading planPRJ-7002FoundationRev AD. Kamat2026-08-0612 dRevision Required
DWG-6106Boomerang — control panel wiringPRJ-7004ElectricalRev AS. Iyer2026-08-153 dEngineering Review
DWG-6107Wave pool — commissioning layoutPRJ-7005HydraulicRev CT. Bhatt2026-07-040 dCustomer Approved

Engineering change management

RefTypeProjectChangeReasonImpactStatus
ECR-2201ECRPRJ-7001Increase flange thickness on funnel spliceStructural check at 20 m diameter revisionBOMDrawingApproved
ECN-2202ECNPRJ-7002Change gelcoat shade to RAL 5015 / 6027 dual toneCustomer change order CO-4102BOMOpen
ECO-2203ECOPRJ-7005Replace VFD make due to obsolescenceSupplier end-of-life noticeBOMDrawingImplemented

Drawing viewer

DWG-6103 Rev B — Pump room hydraulic schematic

Balance tank 1,200 m³ → strainer → 3 × pump 250 m³/h (2 duty + 1 standby)

↓ DN300 header, 2.9 bar

Manifold with butterfly valves → Tornado funnel nozzles (8) + entry flume jets (4)

↓ gravity return

Run-out channel → sand filter bank → balance tank

Markups, revision clouds and customer comments are held against the revision and never overwrite Rev A.