AVR logo
Engineered-to-order manufacturing

The ERP built for custom water slide manufacturers

AVR AquaWorks ERP runs the full lifecycle of a water park project — enquiry, site survey, slide configuration, estimation, contract, engineering drawings, multi-level BOM, FRP moulding, steel fabrication, quality gates, export dispatch, site erection, commissioning and annual maintenance — on one traceable data spine.

18

Modules, lead to AMC

6

Live engineered projects

12 wk

Typical slide lead time

100%

Drawing-linked BOM traceability

AVR brand mark

Traceability chain

  1. 1Lead & site survey
  2. 2Configurator & estimate
  3. 3Quotation & contract
  4. 4Drawings & BOM release
  5. 5MRP, PO & production
  6. 6Quality & dispatch
  7. 7Erection & commissioning
  8. 8Warranty, service & AMC

Every function of the works, connected

Each module writes to the same project record, so a resin price change on the shop floor shows up in project margin the same day.

Sales & estimation

Leads, site surveys, parametric configurator and scenario costing with margin policy checks before a quote leaves.

Engineering control

Concept to fabrication drawings under revision control, with a customer approval gate before production release.

Multi-level BOM & moulds

BOM/BOQ linked to the released drawing revision, plus FRP mould life, tooling cost and maintenance history.

FRP & steel production

MRP-driven procurement, work centre loading, layup and cure batch logs, and fabrication job cards.

Quality gates

Incoming, in-process and pre-dispatch inspections with NCR and CAPA that block dispatch until closed.

Dispatch to commissioning

Crate and container planning, export paperwork, site progress reports and commissioning sign-off.

Service, spares & AMC

Installed asset register, warranty and service tickets, AMC renewals and spares demand.

Project profitability

Milestone invoicing, receivables aging and live project P&L against committed and actual cost.

AI assistant across every module

Margin erosion, schedule slippage, supplier risk and resin consumption variance are surfaced as actionable alerts — not buried in reports.

See live alerts