Each module writes to the same project record, so a resin price change on the shop floor shows up in project margin the same day.
Leads, site surveys, parametric configurator and scenario costing with margin policy checks before a quote leaves.
Concept to fabrication drawings under revision control, with a customer approval gate before production release.
BOM/BOQ linked to the released drawing revision, plus FRP mould life, tooling cost and maintenance history.
MRP-driven procurement, work centre loading, layup and cure batch logs, and fabrication job cards.
Incoming, in-process and pre-dispatch inspections with NCR and CAPA that block dispatch until closed.
Crate and container planning, export paperwork, site progress reports and commissioning sign-off.
Installed asset register, warranty and service tickets, AMC renewals and spares demand.
Milestone invoicing, receivables aging and live project P&L against committed and actual cost.
Margin erosion, schedule slippage, supplier risk and resin consumption variance are surfaced as actionable alerts — not buried in reports.