



One traceable spine from enquiry and site survey through slide configuration, estimation, drawings, multi-level BOM, FRP moulding, steel fabrication, quality gates, export dispatch, erection, commissioning and annual maintenance.
18
Modules, lead to AMC
6
Live engineered projects
12 wk
Typical slide lead time
100%
Drawing-linked BOM traceability
Demo credentials
Pick any role below — every login is live and pre-seeded with project data.
ops.demo@avraquaworks.com
Full lifecycle sandbox — create, edit and delete records
admin.demo@avraquaworks.com
Roles, approval matrix, numbering series, all modules
manager.demo@avraquaworks.com
Projects, milestones, procurement, finance & P&L
engineer.demo@avraquaworks.com
Configurator, drawings, BOM, moulds & production
viewer.demo@avraquaworks.com
Read-only dashboards and registers
Traceability chain
Each module writes to the same project record, so a resin price change on the shop floor shows up in project margin the same day.
Leads, site surveys, parametric configurator and scenario costing with margin policy checks before a quote leaves.
Concept to fabrication drawings under revision control, with a customer approval gate before production release.
BOM/BOQ linked to the released drawing revision, plus FRP mould life, tooling cost and maintenance history.
MRP-driven procurement, work centre loading, layup and cure batch logs, and fabrication job cards.
Incoming, in-process and pre-dispatch inspections with NCR and CAPA that block dispatch until closed.
Crate and container planning, export paperwork, site progress reports and commissioning sign-off.
Installed asset register, warranty and service tickets, AMC renewals and spares demand.
Milestone invoicing, receivables aging and live project P&L against committed and actual cost.

Layup, gelcoat and cure batches logged against mould life and project cost.

Racers, funnels, rafts, lazy rivers and kids play built to configured parameters.

Daily site reports, safety records and commissioning sign-off from the field.
Margin erosion, schedule slippage, supplier risk and resin consumption variance are surfaced as actionable alerts — not buried in reports.